visit our location:
2A Iller Crescent, Maitama, Abuja
Opening Hours:
Mon-Fri 8am-5pm
Send us mail
info@connexxionenergy.com.ng
Phone Number
+234 1 252 5141
Let's Talk

Tag: soloar

Wind Energy

Addressing Wind Energy Innovation Challenges

Wind energy innovation in Africa faces several challenges that need to be addressed for the widespread adoption and success of this renewable energy source: Resource Assessment: Accurate assessment of wind resources is crucial. The availability of comprehensive and reliable data on wind patterns and speeds across the continent is essential

Energy

Improved Electricity Transmission in Africa

for its reliability and efficiency, can offer valuable insights for improving electricity transmission in Africa. Here are some strategies that could be adapted from the Canadian model: Investment in Infrastructure: Canada emphasizes investing in infrastructure. Similarly, Africa needs significant investments in its transmission infrastructure. Upgrading and expanding transmission lines, substations,

manufacturing

Pipelines Facility Projections in Africa

in Africa, leveraging technology, have been vital for the continent's energy sector and economic development. Technology plays a crucial role in various aspects of pipeline facility projections in Africa: Remote Sensing and GIS (Geographic Information Systems): Advanced satellite imagery and GIS technology help in the selection of optimal routes for

Solar Energy

fusion bonded epoxy, concrete coating & Internal coating

Fusion Bonded Epoxy (FBE), Concrete Coating, and Internal Coating are different types of protective coatings used in various industries, particularly in infrastructure, pipelines, and equipment, to prevent corrosion, improve durability, and enhance the lifespan of materials. Fusion Bonded Epoxy (FBE): FBE is a thermosetting polymer coating applied to steel pipes,

Solar Energy

Pile plate integrated embarkment construction

This method is a geotechnical engineering approach used in the construction of embankments or raised ground, particularly in areas where the soil conditions might not be suitable for traditional embankment construction. The process involves: Piles Installation: Piles (long, vertical structural elements) are driven into the ground to provide stability and